The Chapel in Garden Island RAN base is located at the first floor of a historic building, built in 1887. Zaknic Pagano Pty Ltd were engaged by Navy to design and install a lift to this building.

Project Techniques Pty Ltd was asked to design and document the project and Laser Building Services Pty Ltd was responsible for all construction activity as well as closely involved with the design team.

The lift shaft is a concrete structure closely resembling the existing building. The landing has also been designed to fit with the features of the existing building.

Construction started in July 2012 and was completed in January 2013.

Since 2006, Laser Building Services has completed 11 similar projects.